Concrete Step and Porch Mudjacking in Omaha, NE
Front steps, stoops and porch slabs sink and tilt just like driveways do. We lift them back to level with crushed-rock grout, so the step height is even again and the stoop meets the door.
- Free quotes
- 10-year warranty
- Mudjacking specialists
Signs your steps need lifting
A tall first step
The stoop has dropped, so the step up to the door is higher than the others.
Steps pulling away from the house
A gap has opened between the steps and the foundation.
A stoop sloping toward the door
Water runs at the threshold instead of away from it.
A loose handrail
The rail is anchored in concrete that has moved.




Why steps and stoops sink
Steps and stoops sit on the backfilled soil right next to the foundation, which settles more than undisturbed ground. They are also heavy for their footprint, so they sink faster than a flat slab.
Precast steps and poured stoops can both be lifted. Porch slabs can too, once we have looked at how the posts and roof are supported.
Uneven steps are a fall risk, so this is one of the repairs worth doing early.

How we lift it

Drill
We drill one or two holes, about an inch across, in the stoop or beside the steps.

Pump
Grout is pumped underneath until the steps come back up level and tight to the house.

Patch
We patch the holes with concrete and clean up. The steps are ready to use.
Before and after
Before
After
Before
After
What it costs
Most step and stoop jobs take an hour or two. Lifting typically costs one-half to one-third of removing the old steps and pouring new ones.
Every job is different, so we look at it first and give you a price. Quotes are free, and the work carries a 10-year warranty.
Other concrete we raise
Common questions
Can you raise precast concrete steps?
Usually, yes. Precast units and poured steps can both be lifted, as long as the concrete itself is sound.
Can you lift a porch slab with posts on it?
Often, yes. We look at how the posts and roof are supported before we lift anything.
Will lifting the stoop close the gap at the house?
Lifting brings the stoop back toward the house and closes most of the gap. The joint can then be caulked to keep water out.
How long does it take?
Most step and stoop jobs take an hour or two.
Get your free quote
Tell us what has sunk and where. We will take a look and give you a free estimate, with no pressure.
Call or text any time.

