Pole barn building on a concrete slab

Pole Barn Floor Leveling in Omaha, NE

Pole barn and shop floors are often poured on fill, so they settle and crack once the soil under them moves or washes out. We fill the voids and raise the slab with mudjacking.

  • Free quotes
  • 10-year warranty
  • Mudjacking specialists
10Year
Warranty

Every lift is backed by a 10-year warranty

Our mudjacking is warrantied for 10 years against shrinkage or deterioration of the material.

Get a free quote

Signs a pole barn floor needs lifting

Daylight under the slab edge

Soil has washed out and you can see space under the concrete along the wall.

Cracks with one side lower

The slab has broken where it lost support.

A drop at the overhead door

The floor or the apron has settled, so equipment bumps going in and out.

Animals burrowing under it

Burrows take the support away and let more water in.

Concrete floor inside a pole barn
Slab inside a pole barn
Crack in a pole barn concrete slab
A crack where the slab has settled
Empty space under the edge of a pole barn slab
Empty space under the slab edge
Void under a pole barn floor
A void under the floor

Why pole barn floors sink

Most pole barn slabs float inside the posts on fill that was brought in to level the site. If that fill was not compacted, it settles under the weight of tractors, trucks and stored equipment.

Roof runoff along the walls washes soil out from under the slab edge, and animals finish the job.

Mudjacking fills the space under the floor with crushed-rock grout and raises it back to level. Void filling along the edges keeps the problem from spreading.

Edge of a pole barn slab at the wall
Mudjacking pump cart loaded with grout on a job

How we do it

  1. Drilling a small hole through a concrete slab

    Drill

    We drill a pattern of holes, about an inch across, through the settled slab.

  2. Mudjacking nozzle pumping grout through a drilled hole

    Pump

    Grout is pumped under the slab. It fills the empty space, then pressure raises the concrete back to grade.

  3. Crew cleaning up after mudjacking

    Patch

    We patch the holes with concrete and clean up before we leave.

What it costs

Raising a pole barn floor costs much less than tearing it out and pouring a new one, and you do not have to empty the whole building for weeks.

We look at every job before we price it. Quotes are free and written, and the work carries a 10-year warranty.

Other commercial concrete we raise

Common questions

Do I have to empty the building?

We need the area we are lifting cleared. Equipment on the rest of the floor can usually stay.

Can the floor hold a tractor afterward?

The grout is a dense, cement-based material made for supporting slabs. We will tell you on site when heavy equipment can go back on.

Do you travel outside Omaha?

We work within about 30 miles of Omaha, which covers a lot of acreages and farm buildings.

Concrete floor inside a pole barn

Get your free quote

Tell us about the building and what has settled. We will come out, look at it and give you a written price.

(402) 802-9953

Call or text any time.

Every lift is backed by our 10-year warranty.