Loading dock area with concrete paving

Loading Dock Concrete Leveling in Omaha, NE

When the apron or approach slab at a dock settles, trailers no longer line up with the dock and every load bumps on the way in. We raise dock aprons, approaches and ramps with mudjacking.

  • Free quotes
  • 10-year warranty
  • Mudjacking specialists
10Year
Warranty

Every lift is backed by a 10-year warranty

Our mudjacking is warrantied for 10 years against shrinkage or deterioration of the material.

Get a free quote

Signs a loading dock needs leveling

Trailers sit too low

The approach slab has dropped, so trailer beds no longer meet the dock.

A lip at the dock door

Pallet jacks and forklifts catch where the slab meets the building.

Water pooling at the dock

The apron now drains toward the doors instead of away.

Cracked, rocking slabs

Truck weight has broken a slab that lost its support.

Loading dock doors with a concrete apron
Dock doors and apron
Loading dock steps and concrete apron
Dock steps and apron
Concrete floor inside a loading dock bay
Slab inside the dock bay
Concrete ramp at a loading area
Ramp to the loading area

Why dock slabs sink

Dock aprons carry some of the heaviest loads on a property. Trailer landing gear and drive axles put that weight on a small area, over and over.

The soil next to a dock wall is backfill, and water running off the pavement collects there. As the fill settles and washes out, the apron drops.

Mudjacking fills the space under the slab and lifts it back so trailers meet the dock again. The crushed-rock grout is dense, which suits truck traffic.

Mudjacking pump cart loaded with grout on a job
Mudjacking pump cart loaded with grout on a job

How we do it

  1. Drilling a small hole through a concrete slab

    Drill

    We drill a pattern of holes, about an inch across, through the settled slab.

  2. Mudjacking nozzle pumping grout through a drilled hole

    Pump

    Grout is pumped under the slab. It fills the empty space, then pressure raises the concrete back to grade.

  3. Crew cleaning up after mudjacking

    Patch

    We patch the holes with concrete and clean up before we leave.

What it costs

Raising a dock apron costs much less than breaking out and replacing heavy pavement, and the dock is not out of service while new concrete cures.

We look at every job before we price it. Quotes are free and written, and the work carries a 10-year warranty.

Other commercial concrete we raise

Common questions

Do we have to close the dock?

Only the doors we are working in front of, and only while we are there. Tell us your receiving schedule and we will plan around it.

Can you raise thick truck slabs?

Yes. Thicker slabs take more holes and more material, but they lift the same way.

Can you fix the ramp and steps too?

Usually. Ramps, stoops and steps next to a dock settle for the same reasons.

Loading dock doors with a concrete apron

Get your free quote

Tell us about the building and what has settled. We will come out, look at it and give you a written price.

(402) 802-9953

Call or text any time.

Every lift is backed by our 10-year warranty.