Factory Floor Leveling in Omaha, NE
A factory floor that has settled throws machines out of level and makes every joint a hazard for carts and forklifts. We raise and support production floors with mudjacking.
- Free quotes
- 10-year warranty
- Mudjacking specialists
Warranty
Every lift is backed by a 10-year warranty
Our mudjacking is warrantied for 10 years against shrinkage or deterioration of the material.
Signs a factory floor needs leveling
Machines need shimming
Equipment keeps drifting out of level because the slab under it is moving.
Rough forklift lanes
Loads bounce at the joints and operators slow down to cross them.
Hollow-sounding slabs
The floor drums under traffic, which means there is empty space below.
Water or coolant pooling
Low spots collect liquid instead of letting it run to the drains.




Why factory floors settle
Production floors take point loads from machines and constant traffic from forklifts. Vibration and weight work on any soft spot in the fill until a void opens under the slab.
Leaking process water, floor drains and old utility trenches are common places for soil to wash out.
Mudjacking fills the void with crushed-rock grout and raises the slab back to grade. Because the material is cement-based and dense, it suits floors that carry heavy loads.

How we do it

Drill
We drill a pattern of holes, about an inch across, through the settled slab.

Pump
Grout is pumped under the slab. It fills the empty space, then pressure raises the concrete back to grade.

Patch
We patch the holes with concrete and clean up before we leave.
What it costs
Leveling a factory floor costs a fraction of removing and replacing slabs, and it avoids the long cure time that keeps a production area closed.
We look at every job before we price it. Quotes are free and written, and the work carries a 10-year warranty.
Other commercial concrete we raise
Common questions
Can you work around running equipment?
We need clear access to the slabs we are lifting and a safe work zone. Tell us what can and cannot be moved and we will plan around it.
Can you level the slab under a machine?
Often, yes, by drilling around the base. It depends on the machine and how it is anchored, so we look first.
Is there a lot of dust or mess?
Drilling makes some dust and the grout is wet. We contain the work area and clean up before we leave.
Get your free quote
Tell us about the building and what has settled. We will come out, look at it and give you a written price.
Call or text any time.
Every lift is backed by our 10-year warranty.

